SEND US MESSAGE

Cost Saving Reusable Lightweight Alu Alloy Concrete Mold Aluminum Construction Formwork
  • Alu Alloy Concrete Mold Aluminum Construction Formwork Product Description
Product Information

Cost Saving Reusable Lightweight Alu Alloy Concrete Mold Aluminum Construction Formwork 


Introduction of 6061-T6 Aluminum Formwork System:


Material

6061-T6 Aluminium Alloy

Main Components

Beam, Column, Wall, Staircase, Others: floors, slab...

Aluminum Formwork Accessories

Wedge, pin, tie rod, wing nut, washer, bolt, cone, waler stopper, form tie, coupler, clamp, pusher and so on.

Safe working load

60KN/m2

Construction period

3-5 days per storey

Wall Panel Size

Length: 2300mm; 2450mm; Wideth: 300-600mm; or custom-made

Beam Panel Size

Length: 1500mm; Wideth: 100-400mm; or custom-made

Slab Panel SizeLength: 1200mm; Wideth: 200-600mm; or custom-made
Column Panel SizeLength: 3000mm; Wideth: 100-600mm; or custom-made 

Features

Lightweight

One-time Pouring

Cost-Effective

Resist moisture

Reused over 300 times

Recyclable

Environmental Friendly



Aluminium Formwork can be used widely in the construction of high-rise building (Hotels, hospitals, office buildings), residential units and mass housing projects.

It is fast, simple, adaptable and cost effective.

It produces total quality work which requires minimum maintenance and when durability is the prime consideration.

ADTO Cost Saving Reusable Lightweight Alu Alloy Concrete Mold Aluminum Construction Formwork

ADTO Cost Saving Reusable Lightweight Alu Alloy Concrete Mold Aluminum Construction Formwork

ADTO Cost Saving Reusable Lightweight Alu Alloy Concrete Mold Aluminum Construction Formwork



Production process

1. The extruded products will be cut into the right sizes.

2. Some products will be punched to make fastening holes.

3. Some products require additional welding works.

4. Check the products quality

5. Finalized products will be coated with release with release agent.

6. Completed the  pre-assembled before leaving the factory ,to make sure no mistakes.

ADTO Cost Saving Reusable Lightweight Alu Alloy Concrete Mold Aluminum Construction Formwork



Project reference

ADTO Cost Saving Reusable Lightweight Alu Alloy Concrete Mold Aluminum Construction Formwork


Packaging & Shipping

ADTO Cost Saving Reusable Lightweight Alu Alloy Concrete Mold Aluminum Construction Formwork


FAQ

 

1. who are we?
We are based in Hubei, China, start from 1998, sell to Southeast Asia, South Asia, Mid East, Europe, Oceania, South America(5.00%), North America(5.00%), Eastern Asia(4.00%), Africa.
There are total about 1000+ people in our office: Wuhan / Qingdao / Guangzhou.

2. How can we guarantee quality?
Always a pre-production sample before mass production;
Always final Inspection before shipment;

3.What can you buy from us?
Formwork (Aluminum/steel/plastic), scaffolding, construction materials & accessories, aluminum ladders, aluminum profiles and so on ( welcome to contact us for product catalog).

4.What else related accessories do you also supply ?
Yes,such as: Blade\Thread roller\Spanner\Torque wrench\ Thread head\Eccentric shaft...

5. what services can we provide?
Accepted Delivery Terms: FOB, CFR, CIF, EXW, FAS, CIP, FCA, CPT, DEQ, DDP, DDU, Express Delivery, DAF, DES;
Accepted Payment Currency: USD, EUR, JPY, CAD, AUD, HKD, GBP, CNY, CHF;
Accepted Payment Type: T/T, L/C, D/P, D/A, MoneyGram, Credit Card, PayPal, Western Union, Cash, Escrow;


6. How long is your delivery time ?
If the goods are in stock or it’s 7-20 days; if the goods are not in stock, all depends on the quantity.